A large batch of SUNWARD Equipment shipped for the construction of the "Olympic" Sports Complex

The renovated "Olympic" Sports Complex is being prepared for opening in 2025.

Currently the monolithic work on the main building and the sports complex has been completed at the site. The installation of the main building's facade will start soon.

For the construction and erection work and interior finishing (installation of engineering systems), a large batch of equipment was purchased from VERTEX company – 18 units of SUNWARD self-propelled scissor lifts.

The project's engineers selected two models: SWSL1008HD and SWSL1212HD.

The SUNWARD SWSL1008HD is an electric scissor lift with a working height of 10 meters and a load capacity of 230 kg. The lift is equipped with a hydraulic drive which makes it durable and economical. Despite compact size it’s very robust and provides safe operation while requiring minimal maintenance, thereby increasing productivity. The equipment is versatile and suitable for both: сore works and shell works.

The SUNWARD SWSL1212HD is a 12-meter scissor lift model with a load capacity of 320 kg. This equipment is a reliable solution for safe work at height.

The SWSL1008HD and SWSL1212HD are part of the same series, which operates smoothly, quietly, and with reduced-order control. Each machine ensures faster maintenance and additional reliability helping operators complete their tasks more quickly, safely, and cost-effectively.

The determinative factors for the customer's choice of SUNWARD equipment included the official manufacturer's warranty of 36 months, the availability of spare parts in stock in Moscow and a good bonus in the form of spare parts, tools and equipment for maintenance operation.

But the most important thing is the experience of operating equipment by rental companies which certainly guarantees the quality and reliability of these lifts.

Therefore, the use of modern SUNWARD equipment in the construction of the "Olympic" Sports Complex will not only allow the project to be completed on time and with high-quality but also contribute to the development of the construction industry and increase the infrastructural potential of the capital region.